Helicopter Maintenance Facility at RAF Odiham – Morgan Sindall
Blanchard Wells contributed groundworks and concrete frames for a new building at the base that’s large enough to house an RAF Chinook. Its concrete walls are seven metres high with angled ‘chamfered’ edges.
Sector
Military
Military
Value
£1m
£1m
Completed
20 weeks
20 weeks
- Main Contractor : Morgan Sindall
- Package : Groundwork & RC Frame (7m high chamfered walls)
- Location : Odiham
- Engineer : Blyth & Blyth
- Architect : NORR
- Total concrete placed : 2,200m3
- Total soffit formwork : 1,300m2
- Total wall formwork : 700m2
- Staircases : NA
Geoff Pepper, Project Manager,
Galliford Try