IFA2 Daedalus
The next generation of power transmission will rely on infrastructure from Blanchard Wells. This project involved expert groundworks, reinforced concrete walls and slab work at the IFA2 site at Daedalus, Lee-on-Solent for the power line transformer station where the undersea energy connection enters the UK.
Sector
Infrastructure
Infrastructure
Value
£3.5m
£3.5m
- Main Contractor : Morgan Sindall
- Package : Groundwork, RC walls and slab
- Location : Portsmouth
- Engineer : Baker Hicks
Stephen Cripps, Director,
PMC
Back to case studies
PMC